Residual moisture inside pipelines, vessels, and process equipment can lead to corrosion, product contamination, and operational hazards. Before maintenance or recommissioning, it is essential to completely eliminate liquids and humidity to preserve system integrity and ensure safety.
At Ynoptia, our Drying Services are engineered to efficiently remove moisture, protect assets, and prepare systems for safe operations in compliance with strict industry standards.


Why must a pipeline or vessel be dried after a hydrotest?
Water left behind after a hydrostatic test can cause internal corrosion, hydrate formation in gas lines, product contamination and off-spec start-up. Drying removes free water and brings the internal atmosphere down to the dew point required by the operator.
Which drying methods does YNOPTIA use?
We first remove free water with foam or disc pigs, then dry the line or equipment with dry air or nitrogen. The method is chosen according to the diameter, length, required dew point and site constraints.
How is the end of drying verified?
The dew point is measured at the outlet throughout the operation. Drying is complete when the value specified by the operator is reached and remains stable over a hold period.
Can drying be followed by nitrogen inerting?
Yes. Drying is often followed by nitrogen inerting or preservation so that the line stays dry and safe until commissioning. YNOPTIA can carry out the whole sequence on site.
